Client: | MCKK Foundation and MCKK |
---|---|
Date: | Completion 2019 |
Almost all of the buildings in Malay College Kuala Kangsar (MCKK) within the school have reached a state of disrepair that results undesirable living and learning environment for the students. As the results, the client togther with the consultant from various expertise whose belong to alma mater of MCKK had taken the initiative to rebuild the existing Pavillion that housing sudent for education. The major challenge is to conserv the heritage value of Pavillion albeit large-scale reconstruction.
- Full Civil & Structural Engineering Services
- Detailed Design and Site Supervision Works